Day 153: Another coat of paint on the toilet,
banged treated 2x4 under cut floor joist - no way around it for shower drain - for extra support,
cemented parts of drain together.
Day 152: Built airtight composting toilet with urine diverter.
Day 151: Dry fitted drain lines,

designed composting toilet.
Day 150: Caulked shower walls.





No comments:
Post a Comment